Delays on December 17th, 2019
Latest alerts
- December 17th, 2019 at 11:52pm
- BetMGM Meadowlands Rail Line
- Morris & Essex Line, Gladstone Branch and Montclair Boonton Line rail service is operating on or close to schedule with residual delays in both directions following earlier weather-related issues.NJ Transit rail tickets and passes are no longer being accepted by Lakeland Bus.
- December 17th, 2019 at 11:52pm
- Morris & Essex Line, Gladstone Branch and Montclair Boonton Line rail service is operating on or close to schedule with residual delays in both directions following earlier weather-related issues.NJ Transit rail tickets and passes are no longer being accepted by Lakeland Bus.
- December 17th, 2019 at 9:44pm
- M&E train #6675, the 9:51pm from PSNY, is cancelled due to equipment availability. Customers to train #6677, the 10:13pm from PSNY.
- December 17th, 2019 at 9:33pm
- Hudson-Bergen Light Rail
- MBPJ train #1331 the 10:55pm from Hoboken is cancelled due to equipment availability. Customers to train #1133 the 12:08am from Hoboken.
- December 17th, 2019 at 9:33pm
- BetMGM Meadowlands Rail Line
- MOBO Train #6274, the 9:09pm from Montclair State University, was cancelled due to equipment availability. Customers to train #6278, the 10:25pm from MSU.
- December 17th, 2019 at 9:29pm
- BetMGM Meadowlands Rail Line
- Morris & Essex Line, Gladstone Branch and Montclair Boonton Line rail service is subject to up to 30-minute delays in both directions due to weather-related issues. NJ Transit rail tickets and passes are being cross honored by Lakeland Bus.
- December 17th, 2019 at 9:29pm
- Morris & Essex Line, Gladstone Branch and Montclair Boonton Line rail service is subject to up to 30-minute delays in both directions due to weather-related issues. NJ Transit rail tickets and passes are being cross honored by Lakeland Bus.
- December 17th, 2019 at 9:26pm
- Northeast Corridor
- NJCL train #4379, the 9:10 p.m. from Manasquan, is up to 20 min. late due to a late connection from train #3279.
- December 17th, 2019 at 9:15pm
- M&E train #6663, the 8:25pm from Morris Plains is up to 50 min. late due to additional stops made resulting from an earlier cancelled train.
- December 17th, 2019 at 9:13pm
- M&E train #6671, the 9:01pm from Secaucus Junction, is up to 20 mins late due to equipment availability.
- December 17th, 2019 at 9:12pm
- BetMGM Meadowlands Rail Line
- MOBO train #1085, the 8:14pm from Little Falls is up to 60 min. late due to equipment availability resulting from weather related issues.
- December 17th, 2019 at 9:09pm
- BetMGM Meadowlands Rail Line
- Update:Train service in and out of Penn Station New York is operating on or close to schedule with residual delays to trains still en route following congestion caused by earlier signal and weather-related issues on the Morris & Essex Line.
- December 17th, 2019 at 9:09pm
- Update:Train service in and out of Penn Station New York is operating on or close to schedule with residual delays to trains still en route following congestion caused by earlier signal and weather-related issues on the Morris & Essex Line.
- December 17th, 2019 at 9:09pm
- Update:Train service in and out of Penn Station New York is operating on or close to schedule with residual delays to trains still en route following congestion caused by earlier signal and weather-related issues on the Morris & Essex Line.
- December 17th, 2019 at 9:09pm
- Northeast Corridor
- Update:Train service in and out of Penn Station New York is operating on or close to schedule with residual delays to trains still en route following congestion caused by earlier signal and weather-related issues on the Morris & Essex Line.
- December 17th, 2019 at 9:09pm
- Update:Train service in and out of Penn Station New York is operating on or close to schedule with residual delays to trains still en route following congestion caused by earlier signal and weather-related issues on the Morris & Essex Line.
- December 17th, 2019 at 9:08pm
- Hudson-Bergen Light Rail
- MBPJ train #1132, the 8:50pm from Suffern is up to 20 min. late due to equipment availability.
- December 17th, 2019 at 9:01pm
- NEC train #3880, the 8:45 p.m. from Hamilton, is up to 20 min. late due to equipment availability.
- December 17th, 2019 at 9:00pm
- Newark Light Rail
- PVL train #1643, the 8:23pm from Hoboken is up to 35 min. late due to equipment availability.
- December 17th, 2019 at 8:43pm
- Newark Light Rail
- PVL train #1643, the 8:23pm from Hoboken, is subject to up to a 30 min. delay due to equipment availability.
- December 17th, 2019 at 8:29pm
- Hudson-Bergen Light Rail
- MBPJ train #1127, the 7:46pm from Hoboken has been cancelled due to equipment availability resulting from weather related issues. Customer to train #1129, the 8:46pm from Hoboken.
- December 17th, 2019 at 8:20pm
- M&E train #0858, the 6:47pm from Madison is up to 90 min. late due to weather related conditions.
- December 17th, 2019 at 8:18pm
- BetMGM Meadowlands Rail Line
- Morris & Essex Line, Gladstone Branch and Montclair Boonton Line rail service is subject to up to 60-minute delays in both directions due to weather-related issues. NJ Transit rail tickets and passes are being cross honored by Lakeland Bus.
- December 17th, 2019 at 8:18pm
- Morris & Essex Line, Gladstone Branch and Montclair Boonton Line rail service is subject to up to 60-minute delays in both directions due to weather-related issues. NJ Transit rail tickets and passes are being cross honored by Lakeland Bus.
- December 17th, 2019 at 8:09pm
- NEC train #3875, the 7:43 p.m. from Edison, is up to 25 min. late due to congestion caused by earlier signal and weather-related issues on the M&E Line.
- December 17th, 2019 at 7:40pm
- BetMGM Meadowlands Rail Line
- MOBO train #6264, the 7:22pm from MSU is cancelled due to an equipment availability resulting from an earlier tree on the track ahead.
- December 17th, 2019 at 7:35pm
- Hudson-Bergen Light Rail
- MBPJ train #1125, the 7:13pm from Lyndhurst, is up to 25 min. late due to equipment availability.
- December 17th, 2019 at 7:33pm
- BetMGM Meadowlands Rail Line
- MOBO train #1009, the 6:17pm from Bay St. is up to 60 min. late due to an earlier tree down on the track ahead.
- December 17th, 2019 at 7:31pm
- BetMGM Meadowlands Rail Line
- MOBO train #0267, the 5:53pm from Glen Ridge has been cancelled due to an earlier tree down on the track ahead. Customers to train #1009 making additional stops to Dover.
- December 17th, 2019 at 7:27pm
- M&E train #6363, the 7:18pm from PSNY, was cancelled due to equipment availability. Customers to train #6663, the 7:26pm from PSNY, making additional stops.
- December 17th, 2019 at 7:21pm
- M&E Line train #6668, the 6:27pm from Dover, is cancelled due to equipment availability. Customers to train #6670 the 7:03pm from Dover.
- December 17th, 2019 at 7:20pm
- M&E train #6668, the 6:27pm from Dover has been cancelled due to equipment availability resulting from weather related issues.
- December 17th, 2019 at 7:19pm
- Hudson-Bergen Light Rail
- MBPJ train #1173, the 6:36pm from Hoboken has been cancelled due to equipment availability resulting from weather related issues.
- December 17th, 2019 at 7:02pm
- Northeast Corridor
- NJCL train #3515, the 6:25 p.m. from Secaucus, is up to 35-min. late due to congestion caused by earlier signal and weather-related issues on the M&E Line.
- December 17th, 2019 at 6:53pm
- BetMGM Meadowlands Rail Line
- Montclair Boonton Line rail service is suspended due to a tree down on the tracks near Montclair Heights.
- December 17th, 2019 at 6:52pm
- BetMGM Meadowlands Rail Line
- MOBO train #6258 the 6:04pm from MSU has been cancelled due to a tree down on the tracks near Montclair Heights.
- December 17th, 2019 at 6:47pm
- NEC train #3873, the 6:14pm from PSNY, was cancelled due to equipment availability. Customers to train #3875, the 6:47pm from PSNY.
- December 17th, 2019 at 6:44pm
- BetMGM Meadowlands Rail Line
- MOBO train #6258, the 6:04pm from MSU is up to 40 min. late due to a tree on the track ahead.
- December 17th, 2019 at 6:37pm
- BetMGM Meadowlands Rail Line
- Train service in and out of Penn Station New York is subject to up to 20-minute delays due to congestion caused by earlier signal and weather-related issues on the Morris & Essex Line.
- December 17th, 2019 at 6:37pm
- Train service in and out of Penn Station New York is subject to up to 20-minute delays due to congestion caused by earlier signal and weather-related issues on the Morris & Essex Line.
- December 17th, 2019 at 6:37pm
- Train service in and out of Penn Station New York is subject to up to 20-minute delays due to congestion caused by earlier signal and weather-related issues on the Morris & Essex Line.
- December 17th, 2019 at 6:37pm
- Northeast Corridor
- Train service in and out of Penn Station New York is subject to up to 20-minute delays due to congestion caused by earlier signal and weather-related issues on the Morris & Essex Line.
- December 17th, 2019 at 6:37pm
- Train service in and out of Penn Station New York is subject to up to 20-minute delays due to congestion caused by earlier signal and weather-related issues on the Morris & Essex Line.
- December 17th, 2019 at 6:32pm
- BetMGM Meadowlands Rail Line
- MOBO train #6273, the 6:01pm from Glen Ridge is up to 35 min. late due to a tree across the tracks ahead.
- December 17th, 2019 at 6:24pm
- BetMGM Meadowlands Rail Line
- MOBO train #0267, the 5:53pm from Glen Ridge is up to 35 min. late due to an overhead wire problem ahead.
- December 17th, 2019 at 6:24pm
- BetMGM Meadowlands Rail Line
- MOBO train #6279, the 6:10pm from PSNY, is subject to up to a 20 min. delay due to equipment availability.
- December 17th, 2019 at 6:10pm
- Northeast Corridor
- NJCL train #3271,the 5:55 p.m. from PSNY, is up to 25 min. late due to earlier equipment availability.
- December 17th, 2019 at 6:06pm
- BetMGM Meadowlands Rail Line
- MOBO train #6258, the 6:04pm from MSU is subject to a 15 min. delay due to an overhead wire problem near MSU.
- December 17th, 2019 at 5:57pm
- BetMGM Meadowlands Rail Line
- MOBO Train #6273, the 5:48pm from Newark Broad Street, is up to 20 mins late due to equipment availability.
- December 17th, 2019 at 5:52pm
- BetMGM Meadowlands Rail Line
- MOBO train #0267, the 5:41pm from Broad St, is up to 25 min. late due to equipment availability.
- December 17th, 2019 at 5:48pm
- NEC train #3953, the 5:40 p.m. from Secaucus, is up to 15 min. late due to equipment availability.
- December 17th, 2019 at 5:36pm
- Morris & Essex Line rail service has resumed with delays of up to 90-minutes due to weather-related issues. Gladstone Branch service continues to operate with delays of up to 60-minutes following earlier signal issues.NJ Transit rail tickets and passes are being cross honored by Lakeland Bus.
- December 17th, 2019 at 5:11pm
- M&E train #6654, the 3:47pm from Madison is up to 90 min. late due to an earlier disabled train ahead.
- December 17th, 2019 at 5:10pm
- M&E train #0485, the 4:16pm from Summit, is cancelled due equipment availability.
- December 17th, 2019 at 5:08pm
- Morris & Essex Line rail service has resumed with delays of up to 60-minutes following earlier down wire near Millburn. Gladstone Branch service continues to operate with delays of up to 60-minutes following earlier signal issues.NJ Transit rail tickets and passes are being cross honored by Lakeland Bus.
- December 17th, 2019 at 5:06pm
- M&E train #0423 the 3:29pm from Summit is up to 90 min. late due to an earlier disabled train there.
- December 17th, 2019 at 4:27pm
- Northeast Corridor
- NJCL train #3251, the 4:09 p.m. from Little Silver, is up to 15 min. late due to earlier congestion.
- December 17th, 2019 at 4:26pm
- Morris & Essex Line and Gladstone Branch rail service has resumed in both directions with trains subject to delays of up to 60-minutes following earlier signal problems on the Gladstone Branch and downed power wire near Millburn.
- December 17th, 2019 at 4:19pm
- Morris and Essex Line - Gladstone Branch rail service has resumed and is subject to a 60-minute delay in both directions following earlier signal problems between Gladstone and Summit.NJ Transit rail tickets and passes are being cross honored by Lakeland Bus.
- December 17th, 2019 at 4:08pm
- M&E train #6343, the 4:43 p.m. from PSNY, is cancelled due to equipment availability. Customers to train #6643, the 4:45 p.m. from PSNY making additional stops.
- December 17th, 2019 at 3:39pm
- M&E train #6648, the 2:36pm from Summit is cancelled due to a mechanical problem.
- December 17th, 2019 at 3:33pm
- Morris and Essex Line train service is suspended due to downed wires across the track near Milburn.
- December 17th, 2019 at 3:18pm
- Morris and Essex Line train service is subject to a 30- minute delay in both directions due to downed wires across the track near Milburn.
- December 17th, 2019 at 3:17pm
- M&E train #6648, the 2:36pm from Summit, is subject to up to a 60 min. delay due to a JCP&L power line across the tracks near Millburn.
- December 17th, 2019 at 2:36pm
- M&E train #6648, the 2:18pm from Morristown is up to 20 min. late due to equipment availability.
- December 17th, 2019 at 2:33pm
- M&E train #0877, the 2:27pm from Hoboken is subject to a 20 min. delay due to equipment availability.
- December 17th, 2019 at 2:07pm
- M&E train #6631, the 2:01pm from Secaucus, is up to 15 min. late due to equipment availability.
- December 17th, 2019 at 1:39pm
- BetMGM Meadowlands Rail Line
- Morris & Essex Line and Montclair Boonton Line rail service is on or close to schedule in both directions due following earlier weather-related issues. The Gladstone Branch remains suspended.
- December 17th, 2019 at 1:39pm
- Morris & Essex Line and Montclair Boonton Line rail service is on or close to schedule in both directions due following earlier weather-related issues. The Gladstone Branch remains suspended.
- December 17th, 2019 at 12:44pm
- NEC train #3839, the 12:31pm from Edison, is up to 15 minutes late due to earlier congestion.
- December 17th, 2019 at 12:39pm
- Update: M&E train #0854 the 11:58am from Hackettstown is cancelled out of Hackettstown and Mount Olive due to a down tree across the tracks. Train #0854 will originate from Netcong and is up to 30 min. late.
- December 17th, 2019 at 12:38pm
- M&E train #6640, the 12:07pm from Denville, is up to 30 min. late due congestion from weather related issues.
- December 17th, 2019 at 12:33pm
- Update: M&E train #0854 the 11:58am from Hackettstown is cancelled due to a down tree across the tracks. Customers will be handled by a NJT extra service train from Netcong.
- December 17th, 2019 at 12:29pm
- M&E train #6636, the 11:29am from Summit, is up to 65 min. late due earlier congestion from weather related issues.
- December 17th, 2019 at 12:25pm
- Update: M&E train #0851 the 11:05am from Netcong is cancelled due to a down tree across the tracks.
- December 17th, 2019 at 12:17pm
- M&E train #0854 the 11:58am from Hackettstown is up to 30 min. late due to equipment availability. An update will follow.
- December 17th, 2019 at 12:13pm
- Update: M&E train #0851 the 11:05am from Netcong is up to 65 min. late due to a down tree across the tracks. An update will follow.
- December 17th, 2019 at 11:50am
- M&E train #0851 the 11:05am from Netcong is up to 45 min. late due to a down tree across the tracks. An update will follow.
- December 17th, 2019 at 11:43am
- Update: Morris and Essex Line - Gladstone Branch rail service is suspended in both directions due to signal problems between Gladstone and Summit. NJ Transit rail tickets and passes are being cross honored by Lakeland Bus.
- December 17th, 2019 at 11:38am
- Morris and Essex Line - Gladstone Branch rail service is suspended in both directions due to signal problems between Gladstone and Summit.
- December 17th, 2019 at 10:53am
- Correction: M&E train #6628 the 10:03am from Newark Broad St. is up to 55 min. late due to mechanical problems.
- December 17th, 2019 at 10:46am
- Newark Light Rail
- NJ Transit Rail service is on or close to schedule in and out of PSNY with residual delays to trains already enroute following earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 10:46am
- BetMGM Meadowlands Rail Line
- NJ Transit Rail service is on or close to schedule in and out of PSNY with residual delays to trains already enroute following earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 10:46am
- Hudson-Bergen Light Rail
- NJ Transit Rail service is on or close to schedule in and out of PSNY with residual delays to trains already enroute following earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 10:46am
- NJ Transit Rail service is on or close to schedule in and out of PSNY with residual delays to trains already enroute following earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 10:46am
- NJ Transit Rail service is on or close to schedule in and out of PSNY with residual delays to trains already enroute following earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 10:46am
- Northeast Corridor
- NJ Transit Rail service is on or close to schedule in and out of PSNY with residual delays to trains already enroute following earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 10:46am
- NJ Transit Rail service is on or close to schedule in and out of PSNY with residual delays to trains already enroute following earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 10:39am
- Update: RVL train #5719, the 10:06am from Newark Penn Station, is up to 30 min. late due to a late connection with train #3833.
- December 17th, 2019 at 10:13am
- RVL train #5719, the 10:06am from Newark Penn Station, is subject to up to a 25 min. delay due to a late connection with train #3833 resulting from cancelled train #3831. An update will follow.
- December 17th, 2019 at 10:13am
- M&E train #6628 the 9:39am from Chatham is up to 30 min. late due to mechanical problems.
- December 17th, 2019 at 10:09am
- NEC train #3831, the 9:37am from PSNY, was cancelled due to equipment availability. Customers to train #3833, the 9:59am from PSNY making additional stops.
- December 17th, 2019 at 10:02am
- M&E train #6617 the 9:01am from Newark Broad Street is up to 60 min. late due to earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 9:30am
- Newark Light Rail
- NJ Transit Rail service is subject to up to 45-minute delays in and out of PSNY due to earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 9:30am
- BetMGM Meadowlands Rail Line
- NJ Transit Rail service is subject to up to 45-minute delays in and out of PSNY due to earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 9:30am
- Hudson-Bergen Light Rail
- NJ Transit Rail service is subject to up to 45-minute delays in and out of PSNY due to earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 9:30am
- NJ Transit Rail service is subject to up to 45-minute delays in and out of PSNY due to earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 9:30am
- NJ Transit Rail service is subject to up to 45-minute delays in and out of PSNY due to earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 9:30am
- Northeast Corridor
- NJ Transit Rail service is subject to up to 45-minute delays in and out of PSNY due to earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.
- December 17th, 2019 at 9:30am
- NJ Transit Rail service is subject to up to 45-minute delays in and out of PSNY due to earlier Amtrak signal problems near Secaucus and an earlier disabled train in one of the Hudson River tunnels.