Delays on July 15th, 2015
Latest alerts
- July 15th, 2015 at 9:32pm
- BetMGM Meadowlands Rail Line
- MOBO train #6295, the 9:32pm from New York Penn, is cancelled due to an operational issue. Passengers to train #6297, the 10:35pm departure.
- July 15th, 2015 at 6:36pm
- Atlantic City Rail Line
- ACRL train #4634 the 6:41pm from Atco is subject to up to 20 min. late, due to mechanical problem.
- July 15th, 2015 at 6:27pm
- Atlantic City Rail Line
- ACRL train #4635 the 6:14pm from Cherry Hill is up to 20 min. late due to an earlier late train.
- July 15th, 2015 at 6:19pm
- M&E and Gladstone Branch line trains are now operating on/close to schedule, with residual delays to trains already enroute.
- July 15th, 2015 at 6:01pm
- BetMGM Meadowlands Rail Line
- MOBO train #1079, the 5:59pm from Dover, will be delayed up to 10 min. for late connection with train #0643.
- July 15th, 2015 at 5:49pm
- M&E and Gladstone Branch Lines are subject to delays of up to 15 minutes in both directions due to a tree in the overhead wire near Summit station.
- July 15th, 2015 at 5:33pm
- M&E train #6643, the 5:24pm from Summit, is up to 10 min. late due to an overhead power problem.
- July 15th, 2015 at 5:32pm
- M&E train #0643, the 5:17pm from Summit, is up to 20 min. late due to an overhead power problem.
- July 15th, 2015 at 3:09pm
- Northeast Corridor
- NJCL train #3252 the 3:01pm from Elizabeth is up to 15 min. late, due to mechanical problem.
- July 15th, 2015 at 3:07pm
- Northeast Corridor
- Update: NJCL train #3252 the 3:13pm from Newark Penn is Cancelled due to mechanical prob. Psgrs. to train #3852 the 3:21pm from NYPS.
- July 15th, 2015 at 2:11pm
- Northeast Corridor
- Update: NJCL train #3252 has repaired the mechanical problem & is 20min late from Long Branch station.
- July 15th, 2015 at 2:09pm
- Northeast Corridor
- NJCL train #3243 the 2:00pm from Middletown is up to 10 min. late due to track maintenance.
- July 15th, 2015 at 7:46am
- BetMGM Meadowlands Rail Line
- MOBO train #1002 the 7:39am from MSU is up to 10 min. late due to an earlier signal problem.
- July 15th, 2015 at 7:08am
- BetMGM Meadowlands Rail Line
- MOBO train #1000 the 7:03am from MSU is up to 10 min. late due to an earlier signal problem.