Delays on December 25th, 2022

Latest alerts

December 25th, 2022 at 10:46pm
Hudson-Bergen Light Rail
MBPJ train #1784, the 11:28 PM Hoboken arrival is up to 25 min late due to an earlier switch issue.
December 25th, 2022 at 5:25pm
M and E train #6932, the 5:03 PM departure from Dover, is up to 20 min. late due to earlier crew availability.
December 25th, 2022 at 3:33pm
Northeast Corridor
NJCL train #4748, the 3:17 PM departure from Bay Head, is cancelled due to the Brielle Bridge being stuck open. Please take a NJT passenger extra train departing from Manasquan at 3:25 PM.
December 25th, 2022 at 3:27pm
Northeast Corridor
Update: NJCL train #4737, the 1:25 PM arrival into Bay Head, is cancelled at Manasquan due to the Brielle Bridge being stuck open.
December 25th, 2022 at 3:20pm
Hudson-Bergen Light Rail
MBPJ train #0075, the 3:48 PM arrival into Port Jervis, is up to 20 min. late due to signal issues near Campbell Hall.
December 25th, 2022 at 3:06pm
Northeast Corridor
Update: NJCL train #4740, the 1:20 PM departure from Bay Head, was cancelled due to the Brielle Bridge being stuck in the open position.
December 25th, 2022 at 12:59pm
NEC train #7834, the 1:44 PM arrival into PSNY, is up to 30 minutes late following earlier equipment availability issues.
December 25th, 2022 at 9:08am
Hudson-Bergen Light Rail
MBPJ train #1859, the 9:09 AM arrival in Waldwick, is up to 30 min. late following earlier equipment availability issues.
December 25th, 2022 at 8:48am
Northeast Corridor
NJCL train #7620, the 9:43 AM departure from Rahway to NYPS, is cancelled due to equipment availability issues. Please take train #7220, the 10:00 AM departure from Rahway, making an additional stop at North Elizabeth Station.
December 25th, 2022 at 7:30am
Hudson-Bergen Light Rail
MBPJ train #1752, the 7:28 AM arrival into Hoboken, is up to 50 min.late following earlier equipment availability issues.
December 25th, 2022 at 7:06am
Hudson-Bergen Light Rail
MBPJ train #1752, the 6:35 AM departure from Waldwick to Hoboken, is currently delayed due to equipment availability. An update to follow.